skip navigation
Arizona Department of Transportation
 
  Home Page :: Site Index
 
Cordes Junction Interchange

Interstate 17

Roundabout Sign Options

State Route 69

State Route 87

State Route 89 and State Route 89A Corridors

State Route 169

State Route 260 Little Green Valley

Wickenburg



Additional Planned Projects

Completed Projects



Prescott District Projects Home Page
Arizona Travel Information Travel Info AZ511.gov
Adopt a Highway Program Adopt a Highway Program
U.S. 2010 Census - 2010.census.gov

Cordes Junction Interchange

 

The Arizona Department of Transportation (ADOT), in conjunction with the Federal Highway Administration (FHWA), is planning improvements to the Cordes Junction/Interstate 17 traffic interchange (TI).


A larger view is available.                                                      

The map shows some of the plans such as the diamond interchange that will supplement the single lane, curving ramp to the West toward Prescott. Many local road improvements will be done with the partnering of Cordes Lakes and Yavapai County representatives and business owners. ADOT and Department of Public Safety buildings impacted by the new construction will be replaced in the maintenance yard on the west side of I-17, and two roundabouts will be built.

Built in the early 1960s, the Cordes Junction TI now serves over 10,000 automobiles on an average day, and ADOT predicts this volume of traffic will more than double by 2020. The current interchange design mixes local and through traffic, causing congestion and delays. Business owners and residents have asked ADOT and the FHWA to upgrade and improve the interchange and provide secondary access to the Cordes Lakes community. ADOT and FHWA have studied the interchange with consideration for the current and future needs of the public, government agencies and business owners.

The outdated loop ramps will be removed, new structures will be built to carry Prescott bound traffic over I-17, and the roadways will be designed to meet current design criteria. High speed Prescott bound traffic will be separated from Cordes Lakes travelers driving at slower speeds. The existing bridges carrying I-17 over Big Bug Creek will also be replaced.

On May 2, 2008 this project was approved as ADOT’s third “CMAR”, or Construction Manager At Risk - a project delivery contracting method where the contractor is selected based on qualifications and will provide input into the project design. This method is designed to reduce cost, make construction more efficient, and save time. When the CMAR has developed plans to about 95% complete, he provides a GMP (guaranteed maximum price) to build the project. If the price is determined to be fair by ADOT, the CMAR can begin construction activities on finished portions of the design to help save time.

Preliminary work is being done now but the project construction will not occur until 2010 or 2011.

Antler House Village Video

ADOT unearths large Hohokam village at Cordes ~ CV Bugle, 10/28/2008


Artifacts are recovered by archeologists, then cataloged and stored.

 



Contact Information

1.866.751.2083
or
Contact
Prescott District Updates


Sign up for Construction Updates!

First Name

Last Name

Email

Zip Code



I would like to be on the mailing list
for the following projects:

   State Route 89
   State Route 69
   State Route 169
      (Dewey-Humboldt)
   State Route 260 - Verde Valley
   State Route 260 - Rim Country
   State Route 87
      (SR 87 Payson to Pine)
   I-17 Black Canyon Hill
   I-17 McGuireville TI
      (Verde Valley)

 
Privacy Statement | Contact ADOT
© Copyright Arizona Department of Transportation. All Rights Reserved